Coworking Spaces

A base in a PEZA-accredited building in BGC, ready on day one.
Inspire Group (our Philippine head office) holds space in Alliance Global Tower and offers it as a shared office.

* The offices on this page are space that Inspire Group (our Philippine head office) holds in Alliance Global Tower and offers under a joint business arrangement. The contract is concluded directly between you and the operator in the Philippines. What we (Inspire Holdings Co., Ltd. (Japan)) provide is information in Japanese and the introduction.

* We do not hold a real estate brokerage licence in Japan and do not sell, exchange or lease real property in Japan, or act as agent or broker in such transactions.

* Base monthly rates are shown below (based on materials as of April 2025). Final amounts, contract terms and current availability are given individually as at the time of your enquiry. The number of units is limited, so please check availability when you enquire.

An office is decided
alongside incorporation.

Incorporating in the Philippines requires a registered address at the filing stage. Rather than finding premises first and then incorporating, running the two in parallel gets you operating sooner. This page sets out the space our group offers.

What this page covers

· The building and its location (Alliance Global Tower / BGC, Taguig / PEZA-accredited)

· The three unit types and the shared meeting room (small / medium / cubicle / meeting room) and what each includes

· How the costs break down — what is payable in addition to the monthly rent

· The route to a contract, and what we do and do not do

Alliance Global Tower

BGC, Taguig City. An office tower in Uptown Bonifacio.

PEZA-accredited

The building is accredited by the Philippine Economic Zone Authority. A business that meets the registration requirements may qualify for tax incentives. Whether they apply depends on the registration category and the nature of the business.

Central BGC

Taguig City, Metro Manila. Well-built road, power and telecoms infrastructure, and a concentration of English-speaking staff. Many Japanese and Western companies are based here. For current safety information, please refer to the travel advice published by the Ministry of Foreign Affairs of Japan.

Building specification

Fire sprinklers, VRF air-conditioning, carpeted flooring, fitted male and female toilets, and a finished lift lobby. Workstations and chairs are already installed at handover.

Amenities on foot

Uptown Mall adjoins the building, putting dining, retail, a gym and a cinema within walking distance. Day-to-day needs are met around the building.

Transport

Uptown Transport Hub is about 300 m away, a 3–5 minute walk. Buses and vans run from there to destinations across Metro Manila and to major provincial cities.

Planned transport

According to the building's materials, a Mega Manila Subway station is proposed in front of Uptown Eastgate Tower (2028). This is at the proposal stage and the opening date may change.

Three unit types,
plus a shared meeting room.

Units are divided into types by size, and the number of units of each type is limited. The current configuration and availability are given individually as at the time of your enquiry.

Payable in addition to the monthly rent

· CUSA and utilities (electricity and water) are calculated on the space contracted. They are not included in the monthly rent.

· For units where the meeting room is charged separately (small office and cubicle office), an hourly charge applies each time it is used. The meeting room alone is priced in local currency (pesos).

Contract terms

· The standard contract term is 1 year.

· A security deposit and advance rent are payable on signing. The deposit is normally 6 months' rent and advance rent is 1 month's rent. Companies related to Inspire receive a reduced deposit of 2 months' rent.

* The figures above are base rates drawn from materials as of April 2025. They may vary with exchange rates and unit conditions, so the final amounts and contract terms are confirmed individually at the time of your enquiry.

Comparison of the unit types: the 1:2 floor-area ratio between the 50 sqm small office and the 100 sqm medium office; the cubicle office is for one person, a single desk, with no floor area given; and the rate, core space access and meeting-room terms for each unit type.

* The diagram scrolls horizontally.

Figure: floor area by unit type, and what is included versus billed separately (prepared by us). The area diagram shows the 1:2 ratio between 50 sqm and 100 sqm. Figures are base rates as of April 2025; final amounts and contract terms are confirmed at the time of your enquiry.

A desk in Japanese.
A contract with the operator.

What we provide is information in Japanese and the introduction. The lease itself is concluded directly between you and the operator in the Philippines.

Matching a unit

We ask about headcount, budget and start date, and tell you which unit type fits, together with what is currently available.

Arranging a viewing

We arrange viewings in Japanese. Online viewings are also possible. We do not arrange flights or accommodation.

The introduction

We act between you and the operator on confirming terms, exchanging documents, and scheduling the move-in.

Alongside incorporation

SEC registration, BIR tax registration and local permits can be discussed in parallel with securing the space.

Bank account and admin

We take enquiries on opening a corporate bank account and on administrative procedures. The procedures themselves are carried out by Inspire Group (Philippine head office).

PEZA registration

We set out the published information on the registration requirements. The filing itself and post-registration compliance work are carried out by Inspire Group (Philippine head office) and our partner accounting firm there. We do not determine whether incentives apply to you.

* We are not a party to the lease. The contract is concluded directly between you and the operator in the Philippines.

* We do not carry on the real estate brokerage business in Japan within the meaning of Art. 2(2) of the Building Lots and Buildings Transaction Business Act.

* We do not hold client funds, and payments are never routed through an account of ours. Rent and deposits are paid by you directly to the operator.

* We do not provide tax representation, prepare tax documents, or give tax advice within the meaning of Art. 2(1) of the Certified Public Tax Accountant Act. Please take questions on Japanese domestic tax to a certified public tax accountant.

From enquiry to move-in

The usual route. How long it takes depends on the terms agreed and on how quickly documents are ready.

  1. 01

    Enquiry and availability

    We ask about headcount, start date and budget. We then tell you what is available at that point, with the monthly fee and terms.

  2. 02

    Viewing

    In person or online. Check the position of the unit, how the core space and meeting room work, and the condition of the common areas.

  3. 03

    Quotation and terms

    Monthly rent, how CUSA and utilities are calculated, the deposit and advance rent, and the contract term. Raise any questions at this stage.

  4. 04

    Contract

    You conclude the contract directly with the operator in the Philippines. We handle the exchange of documents and the scheduling between you.

  5. 05

    Move-in

    We schedule handover. Workstations and chairs are already installed. If you need telecoms lines or similar arranged, raise it with us at the same time.

Questions we are often asked

Related pages

Start with what is available.

The first consultation is free. Tell us your headcount and start date and we will give you what is available at that point, with the monthly fee and terms. Incorporation can be discussed at the same time.

See Business Support Contact Us
📞03-6823-5140(Weekdays 9:00–18:00)

Notices

* We do not carry out the preparation of documents defined in Article 1-2 of the Certified Administrative Procedures Legal Specialist Act, nor any work reserved to certified public tax accountants or certified social insurance and labour consultants. Documents submitted to public offices in Japan — the notification of moving abroad, and notifications relating to pension, health insurance and tax — should be prepared and submitted by you, or by a qualified professional. Information on this page about procedures in Japan is a general explanation of the schemes concerned.

* What we provide is research into, and the supply of, information on regulatory schemes and daily life. We do not handle legal affairs within the meaning of Article 72 of the Attorney Act of Japan (appraisal, agency, arbitration, settlement, or other legal services). Legal conclusions on specific matters, the drafting and review of contracts, dealings with the authorities, and any response to a refusal are carried out by our partner law firm, qualified in the Republic of the Philippines, under a contract entered into directly with you. We receive no consideration for introductions to that firm. Visa application procedures in the Philippines are carried out by Inspire Group (Philippine head office). We do not act as agent in an application or prepare application documents.

* A visa is issued following review by the relevant authorities of the Republic of the Philippines. Neither we nor our partners guarantee that a visa will be issued. Even where the requirements are met, an application may be refused on review. The content, requirements and costs of these schemes may also change without notice at the discretion of the authorities.

* Neither we nor Inspire Group holds a travel agency registration in Japan. Flights and accommodation for a site visit are secured by you or through a travel agency. We do not act as agent, broker or intermediary in the provision of transport or accommodation services. Where we introduce you to a travel agency, we receive no consideration for doing so.

* What you tell us may be provided to partners located in the Republic of the Philippines (Inspire Group, our partner law firm and others). Where that is the case, we obtain your consent in advance in accordance with Article 28 of the Act on the Protection of Personal Information, and set out at that time the name of the country of transfer, the personal data protection regime of that country, and the measures taken by the recipient. Please see our Privacy Policy for details.

* Please do not enter details of your health, medical history or travel history in the enquiry form. We will ask about those separately when we speak with you.

* The information on regulatory schemes set out on this page was checked against materials published by the relevant authorities on 1 August 2026. The content, requirements and costs of these schemes may change without notice at the discretion of those authorities. Please check the official websites of the relevant authorities for the current position before you travel or apply.

* Information on this page concerns real estate located in the Republic of the Philippines. Inspire Holdings Co., Ltd. does not hold a real estate brokerage licence in Japan and does not engage in the sale, exchange, lease, or brokerage of real property located in Japan. Brokerage, sale, and lease transactions in the Philippines are carried out by PRC-licensed real estate brokers at Inspire Group (Philippine head office). Our role is to provide information in Japanese and to connect you with Inspire Group.

Sources

Source Publisher Published / updated URL Date checked
Alliance Global Tower Joint Business Proposal (building overview, units, facilities) INSPIRE HOLDINGS INC. (Philippine head office) March 2025 — (held by us) 2 August 2026
Shared Office Guide (units, facilities) INSPIRE HOLDINGS INC. (Philippine head office) April 2025 — (held by us) 2 August 2026
Overseas Travel Safety Information Ministry of Foreign Affairs of Japan anzen.mofa.go.jp 3 August 2026
Inspire Holdings
Philippines Business Consulting
24/7 LINE Support for Your
Philippines Business Journey
Feel free to reach out anytime. Japanese & English support.
Chat on LINE
QR Code Scan QR to Add